argos distribution unit, basildon
Client
: gazeley properties
|

Pacific House, Sovereign Harbour Innovation Park,
Eastbourne,
East Sussex, BN23 6FA
Tel: 01323 646284, Email:
admin@iwa.uk.com, Web:
www.iwa.uk.com
|
 |
A £30 million 450,000ft2 Large Distribution Unit with
50,000ft2 of Offices
|
·
Architect
·
M&E
·
Main Contractor |
RDJW
IWA
Simons Construction
|
·
The Brief |
To design full engineering services for a modern
distribution unit with through flow docks which provide a
highly automated fast flow distribution unit on a fast track
construction programme i.e. 10 months from design to
completion.
|
·
Site Specifics |
Demolish and make safe telecommunications factory and
install a 450,000ft2 Distribution Unit on a tight
site bounded by roads on three sides and a Perfume Factory
on the fourth side.
|
·
Services |
Included lighting in aisles, hibay
lighting, roof and in-rack sprinklers, jet venture heating
and ventilation, guided rail fork trucks, smoke vent, fire
detection, full IT and LAN networks, garage, vehicle wash,
fuel station and energy centre.
|

|
|
|
|