Project
:
Vauxhall
Motors Site Luton
Client
:
Southside & City Developments
|

Pacific House, Sovereign Harbour Innovation Park,
Eastbourne,
East Sussex, BN23 6FA
Tel: 01323 646284, Email:
admin@iwa.uk.com, Web:
www.iwa.uk.com
|
·
The Brief -
As well as undertaking the demolition of various buildings
(some of which are adjacent to retained operational
manufacturing facilities), IWA were initially responsible
for the Enabling Works contract. This comprised the
construction of a new 30,000,m2 open
hard-standing for a Vehicle Release Facility (VRF) on which
General Motors (GM) stored their completed vehicles; the
construction of a new 15m x 130m long reinforced concrete
ramp cut through the bottom storey of the retained existing
structure to take the GM vehicle transporters up 8m to the
new VRF; the construction of a new 260m x 15m high external
wall to the existing GM Press Shop (which had to remain
fully operational throughout). The integration of a high
intensity floodlighting solution and diversion of key
electrical, sprinkler mains and security &
telecommunications.
·
Value Engineering
– 7.5 acres of floodlighting had to be installed without
taking up usable ground space by installing on inclines and
roofs. A challenging requirement for such a large area.
·
Energy Efficiency and Green Issues
-
Underfloor heating, New Audio Visual systems, Condensing
Boilers, Ventilation, Domestic Water, Sanitation,
Automatic Controls, Energy Efficient lighting with lighting
control, Power, Security, Fire Detection.
|